Project Details
Schemmer performed a geotechnical exploration of the alignment that consisted of 11 borings placed at strategic locations, tested the soil samples obtained from the borings, and tabulated the test results on boring logs and summary sheets. The data was analyzed to provide site specific recommendations for design and installation for the new pressure sewer.