Project Details
Schemmer was retained by the Nebraska Department of Transportation (NDOT) to provide preliminary and final design services for a replacement bridge located on Highway 1. The new structure is a two-span continuous welded plate girder bridge, 269 feet in length, with unbalanced spans. Design tasks included:
- Phased construction details
- Large grade separation differential
- Precast substructure units
- Self-supporting structural walls
- Geofoam earth fills